We are moving forward at full speed ahead, working on wrapping up this master bathroom project before Christmas vacation. Last week, the shower wall was framed, the Schluter Shower System was installed, the existing walk-in closet door was framed in, tile backer board was installed on the master bathroom floor and drywall was installed/finished where necessary.
Last week the new closet location was also framed and drywalled, in the master bedroom. The closet is prepped and ready for the new french doors. This week the new products will be installed including tile, cabinetry, countertop, toilet and other plumbing fixtures.