Wiping the existing space of all the old fixtures, we are starting fresh with a clean slate. Over the past week, Mike removed all the existing fixtures, flooring and wall between the walk-in closet and master bathroom. All plumbing and electrical work was then roughed in at the new locations.
This week Mike will be preparing the master bathroom for tile installation.
No comments:
Post a Comment