Tuesday, November 6, 2012

Positive Progress

Two weeks ago, Paavo began demolition on this project.  The homeowner said her goodbye to the existing tub, toilet and flooring.  The demo also included the removal of the existing shower system and getting rid of any water damage from the previous shower pan.  All plumbing to the existing shower, that had been located on an exterior wall, was moved to the new shower location on an interior wall.  The plumbing to the existing tub was removed and the space was ready to start being put back together.





Last week our installer began putting up the waterproofing system in the new shower location, after the bench seat was built.  The shower pan and curb was then installed.  Over the next week the shower pan will be waterproofed, as well as all seams and screw holes in the shower area.  The shower will then be ready for tile!




We can't wait to show our client how wonderful the new tile will look in her shower!