Demolition Time!

The first step, in these two bathroom projects, was for Paavo to wipe each space clean of the existing fixtures.  Next, he removed the necessary walls in the master bathroom to accommodate the new design. We'll show you the remodeling process along the way of the master bathroom project, being that it is a much larger remodel than the hall bathroom.  We'll be sure to show all of our fans the final result of the hall bathroom too.

Here is a look into the master bathroom space after the demolition:




By removing walls, we were able to modify and create a more functional space.  Some of the most important items included in our new plan was a larger shower, additional countertop space and more closet space!