Tuesday, March 12, 2013

Out With the Old

Now that the project has begun, Mike's first step was to clear out the items that we were disposing of.  In the hall bathroom this was:  

1.  Existing tile flooring
2.  Existing tile surrounding the tub
3.  Existing light fixtures
4.  Existing decorative fixtures
5.  Existing faucet fixtures

Here's a look at the space after the tile backer board was set on the floor and while the Schluter board was being installed around the tub:





And in the guest bathroom Paavo disposed of:

1.  Existing flooring
2.  Existing countertop/sink
3.  Existing faucets
4.  Existing tile around shower enclosure
5.  Existing light fixtures

Here's a look at the bathroom after he set the backer board on the floor:






Later this week, we'll show you what these spaces look like with the new tile.

No comments:

Post a Comment

Contact Form

Name

Email *

Message *